oil, filter, 5x new shims and a few block connetors should be here tonight or tomorrow...then i can get the engine back in the frame, put the unwrapped loom on and check that everything is fine, if so i will tape it up and weigh it...should have weighed the loom before really. ive saved all the bits of wiring (it can always come in handy) so ill weigh all that along with all the various relays and switches (and the whole LHS switch gear) and work out the weight saving, im thinking 1 - 1.5kg easy!
going to stick with the stock subframe/seats/undertray for the time being until funds improve and i can fit something lighter with a foam/gel pad, and i need to get the front forks moving to assess the possible damage/replacement of them. the left fork definitely needs to go, i cant see damage to the right but im pretty sure the (so im told "not very old") seal is leaking a bit...
a new rear shock will go in when i sort out the rear subframe...i want to try and relocate the battery under the tank along with the fuel pump relay and find an alternative place to put the reg/rec, maybe mount it near the rear brake so its in the airflow...we'll see...thats all for another day.
ive drilled holes in my lightweight ricambi-weiss front fairing for the bracket mounting points, and for the screen, i will fill in the headlight and hoover pipe holes and trim them down to improve the lines/airflow. ill sort out the rest of the mounting holes once everythings back in the frame.

UK ZXR400 L3 (1993) - Fully restored and on the roads, my green beast!
JPN ZXR250 A2 (1990) - Revs to 19,200rpm... 'nuff said
